WKT 0.00% 9.6¢ walkabout resources ltd

The base of the TSF needs to be completed, Tick, The height of...

  1. 8,513 Posts.
    lightbulb Created with Sketch. 7066
    The base of the TSF needs to be completed, Tick, The height of walls, can be raised when required, as long as the base height is complete will be sufficient the mine can start. A pity so much high-grade graphite keeps being located from the surface...

    Abridging loan logically is only a smaller amount to keep the project moving, not the full amount...The project has not stopped on-site, while the ships are critical pathway if delayed...Nothing in it for you...

    A great update yesterday...

    Regards Croc
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
9.6¢
Change
0.000(0.00%)
Mkt cap ! $64.44M
Open High Low Value Volume
9.7¢ 10.0¢ 9.6¢ $20.78K 213.6K

Buyers (Bids)

No. Vol. Price($)
3 70041 9.6¢
 

Sellers (Offers)

Price($) Vol. No.
9.9¢ 40300 1
View Market Depth
Last trade - 16.10pm 11/09/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.