WKT 6.67% 9.8¢ walkabout resources ltd

The base of the TSF needs to be completed, Tick, The height of...

  1. 8,409 Posts.
    lightbulb Created with Sketch. 6922
    The base of the TSF needs to be completed, Tick, The height of walls, can be raised when required, as long as the base height is complete will be sufficient the mine can start. A pity so much high-grade graphite keeps being located from the surface...

    Abridging loan logically is only a smaller amount to keep the project moving, not the full amount...The project has not stopped on-site, while the ships are critical pathway if delayed...Nothing in it for you...

    A great update yesterday...

    Regards Croc
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
9.8¢
Change
-0.007(6.67%)
Mkt cap ! $65.78M
Open High Low Value Volume
10.0¢ 10.5¢ 9.1¢ $244.2K 2.461M

Buyers (Bids)

No. Vol. Price($)
1 360000 9.6¢
 

Sellers (Offers)

Price($) Vol. No.
9.8¢ 200933 1
View Market Depth
Last trade - 16.10pm 06/08/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.