RLT 1.41% 72.0¢ renergen limited

The Performance Test is envisioned to run over a period of seven...

  1. 2,376 Posts.
    lightbulb Created with Sketch. 457
    The Performance Test is envisioned to run over a period of seven days and will measure several critical criteria that span recoverability of product, purity of product, and overall utility efficiency to ensure the plant performs in accordance with the original design specifications.

    Don't think the test has passed and looking at the share price they aren't producing nada, can't wait for the next bs excuus
 
watchlist Created with Sketch. Add RLT (ASX) to my watchlist
(20min delay)
Last
72.0¢
Change
0.010(1.41%)
Mkt cap ! $21.83M
Open High Low Value Volume
73.0¢ 73.0¢ 70.5¢ $2.525K 3.508K

Buyers (Bids)

No. Vol. Price($)
1 500 71.0¢
 

Sellers (Offers)

Price($) Vol. No.
73.0¢ 63 1
View Market Depth
Last trade - 13.52pm 24/07/2024 (20 minute delay) ?
RLT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.