AZL 6.67% 1.6¢ arizona lithium limited

Ann: Lithium Drilling Approval at Prairie, page-69

  1. 218 Posts.
    lightbulb Created with Sketch. 164
    Prior to finding SLB within the Prairie Lithium JORC, Koch was on top of my list of possible engineering firms to provide a DLE platform which matched Brett's description of the project flowsheet. Anyway, we will soon know the answers to this question as we start to prepare our first commercial DLE facility in 2024.

    An interesting event occurred in the webinar, I believed Jane may have mention their name in the live webinar, so check out the time interval 20.43 sec. It’s a fascinating edit which adds to the secrecy. Something extra is happening here, regarding our unknown DLE technology provider other than the build cost, and the royalty’s terms and conditions. It wouldn’t surprise me there is addition partnership contract or licence for usage of the Plix resin in their lithium platform as well. Possible win-win. This is only speculation!

    What interesting times we holders live in, with the plethora of value adding announcements over the next couple of weeks.



 
watchlist Created with Sketch. Add AZL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.