Lets hear some DSO valuations to pass the time!
Here's mine all pricing in $Aud.
Minning cost/ per tonne $3.95
Downstream processing $34.61
Shipping / per tonne $13
Crushing / per tonne $6
Trucking transport / per tonne $30
Site cost $2
Tax $22.5
Total cost $112.06
Price per tonne 1.5% ore $200
Margin $87.94
Spodumene ore at 1.5% 1.8mill tonnes
Adjusting for minning recovery and dilution 90%
Margin x 1.62mill tonnes =$142,462,800 Aud.
Giving the fact that our dso price was $200 in may. Going off the the etf price of lithium is valued 30% higher there is still a possibility of a higher dso price.
I would say our cash flow over the 18 months could be between $120mill and $160mill and if bp33 can second that we will not be sitting on a mc of 22mill.
Some news plz drilling update or offtake by the 31st.
Cheers gltah
- Forums
- ASX - By Stock
- Ann: Lithium Potential of the Barrow Creek Project Confirmed
Lets hear some DSO valuations to pass the time! Here's mine all...
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.2¢ |
Change
-0.002(2.13%) |
Mkt cap ! $200.8M |
Open | High | Low | Value | Volume |
9.4¢ | 9.4¢ | 9.2¢ | $218.3K | 2.350M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 696304 | 9.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.4¢ | 514200 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 695288 | 0.092 |
31 | 1582214 | 0.091 |
88 | 3538224 | 0.090 |
19 | 952469 | 0.089 |
16 | 1013576 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.094 | 377643 | 13 |
0.095 | 516001 | 6 |
0.096 | 1040853 | 3 |
0.097 | 412000 | 4 |
0.098 | 550000 | 3 |
Last trade - 10.23am 30/07/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online