Still trying to squirm out of getting it wrong.
Core Mining deposits/mine pits are going to be several kms apart, not One mine pit whatever way you want to describe it.
You say that SDL is several deposits not one like Core Mining has. Mbarga and Mbarga South mine pits will be separate, but the outline of these deposits join up with each other, Not several kms apart. The same with Mbarga West deposit outline will join up with Mbarga mine pit, Not several kms apart.
Once itabirite is involved these deposits/mine pits will end up being roughly One big pit.
If Core Mining deposits/zones were One, why would they call the zones West- Central and East?
You are lying again, do you not understand the meaning of telling the truth and telling lies?
I did not say anything about iron ore being back up over US$100 per tonne. Lire.
You make things up as you type. Try typing and not thinking at the same time. Write your remarks down first.
The Cameroon Government are in fact planning on the Railway being able to carry 200Mtpa. SDL were planning and pricing the rail line to carry 50Mtpa, but say it could carry 100Mtpa with a few extra passing bays.
Have a dig/flame and bait me as much as you like, I know what I post is true. So do most others.
Westcott
SDL Price at posting:
1.2¢ Sentiment: None Disclosure: Held