    Iain might be overly conservative stating the kingia was exposed to mud for 4 weeks. I think the cement that made it into the annulus was possibly much more than the ‘minimal’ amount as originally announced on 22/9 (see below) and possibly original job cement extended from bottom all the way up to 900m below the surface.
    https://hotcopper.com.au/posts/56952344/single


    Announcement to ASX
    LOCKYER DEEP-1 OPERATIONAL UPDATE
    27 September 2021
    ng operations at the Lockyer Deep-1 conventional gas discovery well.
    Further to the Company's announcement of 22 September 2021, the 5-1/2" production casing was run from surface to Total Depth. During casing cementing operations the cement was not displaced into the annulus, due to a suspected wiper plug held up in the casing hanger. This has resulted in the cement remaining within the 5-1/2” production casing, with only minimal cement in the production annulus. The cement wiper plugs and cement are currently being milled out to attain well access and re-cement the production casing for future completion and production testing.
    Last edited by justinmetals: 07/12/21
 
watchlist Created with Sketch. Add NWE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.