The reinjection of water back into the gas fields in central Queensland is not even a fraction of the process circuits required to extract, separate, dehydrate, compress, send up the line to Curtis Island where there is a massive facility with 6 trains across 3 owners, all running Conoco's Cascade process.
https://hotcopper.com.au/threads/ann-lke-bell-potter-unearthed-conference-070223.7215808/page-40?post_id=66120580
"This is NOT a complicated project from a processing point of view"
Although the claim from team Elmer that ~300 Meter diameter extraction wells are required - 4 wells per 5 km at ~300 Meters in diameter, will need some vetting for accuracy. Seems it could be a bit of an exaggeration.
- Forums
- ASX - By Stock
- LKE
- Ann: LKE Bell Potter Unearthed Conference 070223
Ann: LKE Bell Potter Unearthed Conference 070223, page-63
-
-
- There are more pages in this discussion • 198 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
|
|||||
Last
3.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.72M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.4¢ | $58.86K | 1.714M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 1317660 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 259343 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 689631 | 0.034 |
16 | 945687 | 0.033 |
8 | 378281 | 0.032 |
14 | 1791825 | 0.031 |
22 | 1365432 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 259343 | 3 |
0.036 | 465629 | 5 |
0.037 | 1082055 | 6 |
0.038 | 1238752 | 7 |
0.039 | 1393027 | 6 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |