    Ah... yes.... I'm not talking about a 'building' to house equipment! I'm talking (please correct me if I'm wrong), the engineering design and drawings (mecanno set) that are required to assemble the equipment inside the already built facility are only 36% completed!!! I guess that's why completion is slated for early 2023. The Roaster which was supposed to be ordered by the beginning of May now looks like being ordered at the end of May. David has stated many times that this is an 8 month lead time item!! Do the maths! That's Jan finish of roaster plus delivery... blah blah... Hopefully the engineering design work keeps ahead of construction and delivery of all the other bits and pieces (hardware).
    Building a carpark and a bunch of offices is kids play. It's the assembly of the processing and manufacturing equipment in the building that I am keen to see.
 
watchlist Created with Sketch. Add LMG (ASX) to my watchlist
(20min delay)
Last
3.7¢
Change
0.000(0.00%)
Mkt cap ! $86.87M
Open High Low Value Volume
3.8¢ 3.9¢ 3.6¢ $35.92K 951.1K

Buyers (Bids)

No. Vol. Price($)
1 24999 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 134036 1
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
LMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.