The unique opportunity with the demo plant is to get paid $$$ to process the Engie tailing dam material left over from Morwell open cut. In that instance the Mg and by products are just gravy. I laugh every time I see Engie ads saying they are working to carbon neutral by 2045. If the penny drops with people about the tailings dam situation as it currently stands, Engie will be in all sorts of reputational trouble. Currently the only options are to move it to Yallourn open cut (cost maybe $200m) or get it processed. Watch this space.
- Forums
- ASX - By Stock
- LMG
- Ann: LMG selects Malaysia for its 100,000tpa magnesium plant
Ann: LMG selects Malaysia for its 100,000tpa magnesium plant, page-91
Featured News
Add LMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $84.54M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 26315 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 200000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 26315 | 0.038 |
1 | 54500 | 0.037 |
5 | 83497 | 0.036 |
2 | 119146 | 0.035 |
1 | 25000 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 200000 | 1 |
0.040 | 956557 | 2 |
0.042 | 50000 | 1 |
0.044 | 150000 | 1 |
0.045 | 145511 | 3 |
Last trade - 08.40am 02/10/2024 (20 minute delay) ? |
Featured News
LMG (ASX) Chart |
Day chart unavailable
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online