The unique opportunity with the demo plant is to get paid $$$ to process the Engie tailing dam material left over from Morwell open cut. In that instance the Mg and by products are just gravy. I laugh every time I see Engie ads saying they are working to carbon neutral by 2045. If the penny drops with people about the tailings dam situation as it currently stands, Engie will be in all sorts of reputational trouble. Currently the only options are to move it to Yallourn open cut (cost maybe $200m) or get it processed. Watch this space.
- Forums
- ASX - By Stock
- LMG
- Ann: LMG selects Malaysia for its 100,000tpa magnesium plant
Ann: LMG selects Malaysia for its 100,000tpa magnesium plant, page-91
Featured News
Add LMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.8¢ |
Change
-0.001(2.04%) |
Mkt cap ! $92.94M |
Open | High | Low | Value | Volume |
4.9¢ | 5.0¢ | 4.8¢ | $17.34K | 356.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 162996 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 60823 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 162996 | 0.048 |
3 | 525661 | 0.047 |
2 | 800000 | 0.046 |
3 | 756000 | 0.045 |
2 | 772000 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 60823 | 4 |
0.050 | 339130 | 2 |
0.051 | 200000 | 1 |
0.059 | 164487 | 2 |
0.072 | 1000000 | 1 |
Last trade - 16.10pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
5.0¢ |
  |
Change
-0.001 ( 4.82 %) |
|||
Open | High | Low | Volume | ||
4.8¢ | 5.0¢ | 4.7¢ | 463116 | ||
Last updated 14.04pm 05/06/2024 ? |
Featured News
LMG (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non-Executive Director
Simon Kidston
Non-Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online