it included a portion of the deep resource at yarrabubba but did not include the “at surface material” that’s why the life of mine costs remained high.
once the at surface material is include and filled into the production schedule Tmt will be mining as soon as ground is broken
- Forums
- ASX - By Stock
- TMT
- Ann: Locking Down Infrastructure to Support Delivery of the MTMP
Ann: Locking Down Infrastructure to Support Delivery of the MTMP, page-59
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)