That is a down ramp if I have ever heard one haha. So you are saying that management are being untruthful re the timeline not being influenced for flow testing and no material change other than a little bit more money. Still less than the 20 mil we expected for drilling/testing ect.
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-147
- There are more pages in this discussion • 190 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)