Hi Rig9
Hey, hope you do well with NWE and hopefully sooner than later and so you can enjoy it!
But you know, this is just engineering and if there is a problem at the end, there should be the "where with all" to either as you say perforate and squeeze or perhaps cut and remove some casing at the bottom if it's plugged. It's just engineering (albeit tricky engineering) instead of getting radical and doing a side track or a new well. That would be a nuisance and an expensive one too. All going well, we won't need that!
Let's hope (and pray) that all goes well![]()
W
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-163
-
- There are more pages in this discussion • 174 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)