I’m guessing it’s more a contractual obligation than it is a matter of patience or booking slots. If I’m not mistaken, it’s the problem of the drilling contractor not NWE and they’ve got to deliver with add costs for risks and faults etc. If the BOP was under capacity as per WE3 that’s a different story…. Please Correct me if I’m wrong
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-256
-
-
- There are more pages in this discussion • 81 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)