Hard to perform a flow test on a well that is concreted up or damaged trying to remove it.
- Forums
- ASX - By Stock
- Ann: Lockyer Deep-1 Operational Update
Hard to perform a flow test on a well that is concreted up or...
-
-
- There are more pages in this discussion • 274 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)