Hydroxide assay results from the pilot should be out within the next few weeks.
Same with the location trade off study (sudsbury canada, or Abu Dhabi). We need to be near ports, acid and facilities which can use byproducts and residue if we want to maximise our potential so location is vital.
DFS for the p1 due by March.
Some sort of funding for construction
I really recommend checking out @In4apenny s "path to production" thread which has a great timeline of key developments in the works.
https://hotcopper.com.au/threads/path-to-production.5088480/
- Forums
- ASX - By Stock
- Ann: LOI with BASF extended to 31 December 2020
Hydroxide assay results from the pilot should be out within the...
-
- There are more pages in this discussion • 84 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $17.17M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
176 | 200484476 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 96579862 | 58 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
176 | 200484476 | 0.002 |
43 | 173561088 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 96579862 | 58 |
0.004 | 38446890 | 39 |
0.005 | 11336744 | 12 |
0.006 | 9227565 | 15 |
0.007 | 4963896 | 6 |
Last trade - 12.55pm 12/07/2024 (20 minute delay) ? |
Featured News
LPD (ASX) Chart |
Day chart unavailable