VRC 0.00% 0.4¢ volt resources limited

Ann: Luiri Hill Gold Project Resources Estimate In Progress, page-2

  1. 1,637 Posts.
    lightbulb Created with Sketch. 359
    Luiri Hill Gold Project Updated Mineral Resource Estimate In Progress

    Highlights include:

    * Update of Luiri Hill Gold Project Mineral Resource estimate being prepared in accordance with the 2012 JORC code and will be released in the near future.
    * Technical site visit completed as part of the due diligence programme confirmed the existence of various large stockpiles, pads and dumps.
    * The Project area has good existing power and water infrastructure.
    * The Luiri Hill Gold Project is an advanced project with metallurgical, historic Mineral Resource estimates, feasibility studies and significant other work undertaken by credible international consultants with over US$20 million expended on the project to date.
    * Shareholder meeting to approve issue of Volt shares to Luiri Hill Gold Project vendors scheduled for Monday 20 July 2020.
    Last edited by madgwick: 22/06/20
 
watchlist Created with Sketch. Add VRC (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $16.63M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $1 241

Buyers (Bids)

No. Vol. Price($)
49 27810780 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 2664984 4
View Market Depth
Last trade - 12.27pm 09/07/2024 (20 minute delay) ?
VRC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.