Drilling to start at the end of the wet season(april to may)this is what I have been waiting on.
Drilling should see a stronger sp on speculation and a sp much higher on any good hits.
At this stage it looks like two to three months before drilling starts or maybe earlyer if the weather is good.
With the xray flow sorter now on site I would expect weekly reports of each sample that has been sorted in about two weeks once the plant is up and running at full speed with the flow sorter conected.
Altho the sp is up today,there is not a lot of buyer build up on the buy side above 0.044 cents but im sure that will change over the next few weeks.
- Forums
- ASX - By Stock
- LOM
- Ann: Lulo Project Update
Ann: Lulo Project Update , page-3
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LOM (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
-0.001(2.33%) |
Mkt cap ! $12.18M |
Open | High | Low | Value | Volume |
4.1¢ | 4.2¢ | 4.1¢ | $4.94K | 120.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7500 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.3¢ | 138576 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.040 |
4 | 497871 | 0.039 |
1 | 60000 | 0.037 |
2 | 123111 | 0.036 |
3 | 381414 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.043 | 138576 | 3 |
0.044 | 112000 | 1 |
0.045 | 38400 | 2 |
0.046 | 181600 | 2 |
0.047 | 124900 | 2 |
Last trade - 11.21am 11/10/2024 (20 minute delay) ? |
Featured News
LOM (ASX) Chart |