AMN 2.86% 17.0¢ agrimin limited

Ann: Mackay Potash Project Process Engineering Update, page-11

  1. 190 Posts.
    lightbulb Created with Sketch. 75
    Kalium had two heat exchangers delivered in an effort to control temperature at the front of its flow sheet at conversion. It’s not a low bow to draw to figure out why? Anyway, take the AMN results as you will, I don’t think you’re actually listening to the point I have made. You keep talking about floating leonite…
 
watchlist Created with Sketch. Add AMN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.