Table 9. $78M is pre-production costs for both sulphide resources (BS and Copenhagen). They've removed gold sales from pre-production costs. So when gold sales are removed to provide an actual pre-production 'cost', it's $78M. Unless I've made a error...Happy to be corrected.
- Forums
- ASX - By Stock
- CAI
- Ann: Maiden Blue Spec Reserve underpins expansion for Warrawoona
Ann: Maiden Blue Spec Reserve underpins expansion for Warrawoona, page-9
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online