FFM 5.59% 85.0¢ firefly metals ltd

Ann: Maiden Diamond Drilling Commences at Pickle Crow, page-101

  1. 10,702 Posts.
    lightbulb Created with Sketch. 1430
    Concerning First Mining's current projects, strange that they JV'd Pickle Crow with us, as the deposit was only referred to as a side gig before hand & yet, I think their main Tier 1 Project is Springpole Lake Project? Has an indicated Resource of 4.67 Moz @ 1.04 g/t Au. Low grade but, if shallow open pit mining with low Strip (I have no idea) then, good project that's for sure.

    However, our Pickle Crow Project which we are coughing up all the money for exploring the old mining deposit. Has an Inferred Resource of 1,23Moz's @ 4.1 g/t Au, already, before exploration so, we await the updated 2012 Jorc Resource, Monday? what.png

    Few stats:
    Extensive infrastructure in-place or proximal to project including ~ 200 tonnes per day (tpd) gravity mill
    OnsiteGenerators and fuel storage
    Paved road access to property
    Within 10 km of paved airport at Pickle Lake
    Project is located within a pro-mining jurisdiction that is covered by the Treaty Nine First Nations Agreement

    Just got a wiggle in my jocks confused.png lol
 
watchlist Created with Sketch. Add FFM (ASX) to my watchlist
(20min delay)
Last
85.0¢
Change
0.045(5.59%)
Mkt cap ! $385.3M
Open High Low Value Volume
81.0¢ 85.0¢ 80.5¢ $3.793M 4.578M

Buyers (Bids)

No. Vol. Price($)
1 2994 83.5¢
 

Sellers (Offers)

Price($) Vol. No.
85.0¢ 1034 1
View Market Depth
Last trade - 16.10pm 07/05/2024 (20 minute delay) ?
Last
84.0¢
  Change
0.045 ( 4.62 %)
Open High Low Volume
80.5¢ 85.0¢ 80.5¢ 2317455
Last updated 15.59pm 07/05/2024 ?
FFM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.