I'll have a look over the central area to see if I can find the 6 holes earmarked for the central area. The eastern area had the holes in fairly close proximity, so that makes it easier to find. I'll have a good look around when I get some time, see if I can spot anything and if there's something to see, I'll post it.
I could only find reference to the RC drilling, nothing about core drilling. I'm working off the report 26-6-2023. Have I missed something there? Usually RC is used for a maiden drill program. Core drilling, which is more expensive and takes longer, usually comes later when the resource is better defined.
I'll keep looking around for any evidence of expansion of the program, but that can be be a bit like looking for a needle in a haystack, so no promises there (single sporadic holes compared to a linear sequence of holes during later drilling campaigns). The opportunistic expansion did depend on the availability of the drill rig as well, so that might have been an issue. From the 26-6-2023 report:
In any case, 19 holes roughly equals 19 days plus some possible lay days. That takes us to around week 1 of July. So it looks like we're on schedule for results at the end of July / end of August.
GLTAH.
- Forums
- ASX - By Stock
- Ann: Maiden drilling program commences at Tambourah Lithium
TKM
trek metals limited
Add to My Watchlist
5.33%
!
7.9¢

I'll have a look over the central area to see if I can find the...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
7.9¢ |
Change
0.004(5.33%) |
Mkt cap ! $46.35M |
Open | High | Low | Value | Volume |
7.5¢ | 7.9¢ | 7.1¢ | $39.26K | 514.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 7.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.9¢ | 148484 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.073 |
3 | 208616 | 0.071 |
1 | 1500 | 0.070 |
2 | 29000 | 0.069 |
2 | 214925 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.079 | 148484 | 3 |
0.080 | 120000 | 2 |
0.100 | 404521 | 2 |
0.105 | 244533 | 3 |
0.110 | 100400 | 2 |
Last trade - 16.10pm 17/06/2025 (20 minute delay) ? |
Featured News
TKM (ASX) Chart |
The Watchlist
RC1
REDCASTLE RESOURCES LIMITED
Ronald Miller, Non-Executive Director
Ronald Miller
Non-Executive Director
SPONSORED BY The Market Online