ENV 10.0% 1.1¢ enova mining limited

Drilling in several months obviously you need to read between...

  1. 315 Posts.
    lightbulb Created with Sketch. 66
    Drilling in several months obviously you need to read between the lines. Phase 1 will take several months and Phase 2 drilling likely to also take some time. It could run concurrently but guess they had to say something as they need Phase 1 to determine drill targets.

    The capital raise is coming.
 
watchlist Created with Sketch. Add ENV (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $10.53M
Open High Low Value Volume
1.1¢ 1.1¢ 1.1¢ $44.25K 4.035M

Buyers (Bids)

No. Vol. Price($)
1 246147 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 4478787 7
View Market Depth
Last trade - 16.10pm 11/07/2024 (20 minute delay) ?
ENV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.