FHE 2.25% 43.5¢ frontier energy limited

New technology...and software... • Drill holes data were...

  1. 827 Posts.
    lightbulb Created with Sketch. 139
    New technology...and software...


    • Drill holes data were digitised from the mine plans and cross-sections entry from hardcopy logs into
    Excel. All data in Excel was then checked against the original hardcopy logs including collar
    information, downhole surveying, geology logging and assays. Any errors detected in the Excel files
    was corrected.
    • Intervals not sampled were assigned a zero-grade value.
    • Drillholes were uploaded to 3D mining software packages for error detection and on and on-screen
    inspection and validation.
    Data validation
    procedures used.
    • Data were loaded into 3D mining software packages and validation checks for location, downhole
    surveys, intervals and integrity were made. The data was also checked against plans, cross sections
    and long sections to detect any errors in data entry for both locations and downhole data.
    ...

    Still a few unknown risks ...but I couldn't resist buying in ..
 
watchlist Created with Sketch. Add FHE (ASX) to my watchlist
(20min delay)
Last
43.5¢
Change
-0.010(2.25%)
Mkt cap ! $194.1M
Open High Low Value Volume
44.0¢ 44.0¢ 43.0¢ $69.64K 160.4K

Buyers (Bids)

No. Vol. Price($)
3 33424 43.0¢
 

Sellers (Offers)

Price($) Vol. No.
43.5¢ 56927 2
View Market Depth
Last trade - 15.46pm 17/06/2024 (20 minute delay) ?
Last
43.5¢
  Change
-0.010 ( 1.14 %)
Open High Low Volume
43.0¢ 43.5¢ 43.0¢ 28145
Last updated 14.34pm 17/06/2024 ?
FHE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.