Negative mate. Only Two through-puts needed. Most Kaolin deposits require Three.
You're more than likely aware that ESG is the primary driver in all things Resources forth coming? If not. Let me assure you, that is the case.
In my opinion. For what that's worth? I believe that the bulk of the projected 300ktpa shortfall in 4NHPA going out to 2027 will be sourced through defunct, toxic Tailings Dams & the like. Governments, State and Federal are having logistical, and financial nightmares keeping control over the literally Thousands of these throughout the country. There is as much as a Half Billion Dollar driver behind it. And it's the only way I believe that the shortfall in demand will be met.
Win, Win, Win situation all round.
- Forums
- ASX - By Stock
- Ann: Maiden Mineral Resource Estimate of 24.7Mt for Tampu Project
Negative mate. Only Two through-puts needed. Most Kaolin...
-
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CR9 (ASX) to my watchlist
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.116M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.1¢ | $1K | 90.90K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 194318 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 829988 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 194318 | 0.010 |
4 | 875461 | 0.009 |
3 | 620000 | 0.008 |
2 | 590000 | 0.007 |
1 | 250000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 829988 | 3 |
0.012 | 466150 | 1 |
0.016 | 126983 | 1 |
0.020 | 24871 | 1 |
0.026 | 500000 | 1 |
Last trade - 10.02am 15/07/2024 (20 minute delay) ? |
Featured News
CR9 (ASX) Chart |