Resource is constrained by an optimised (computer generated) pit shell to demonstrate Reasonable Prospects for Eventual Economic Extraction (RPEEE) as required by JORC.
The optimisation process (usually using the Whittle algorithm/process) uses various inputs including gold price as part of the optimisation process. These inputs are shown on page 13. Incorrect gold price would result in incorrect optimised shell and therefore incorrect MRE.
- Forums
- ASX - By Stock
- Ann: Maiden Mineral Resource Estimate sets foundation at El Zorro
Resource is constrained by an optimised (computer generated) pit...
-
- There are more pages in this discussion • 152 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TSO (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
-0.003(9.38%) |
Mkt cap ! $45.04M |
Open | High | Low | Value | Volume |
3.2¢ | 3.2¢ | 2.9¢ | $96.29K | 3.206M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 396896 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 382024 | 0.029 |
5 | 845714 | 0.028 |
2 | 630000 | 0.027 |
1 | 23076 | 0.026 |
3 | 800000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 250000 | 1 |
0.032 | 1425762 | 2 |
0.033 | 23000 | 1 |
0.035 | 691131 | 5 |
0.036 | 980232 | 2 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
TSO (ASX) Chart |