Peter I think was off the mark, Something has gone wrong with that POG either they f*ed it up and ran with it or its their actual figure!
I agree with their method of using higher POG for resource because our resource is not defined fully yet, mostly it is in inferred category. It doesn't mean that we are not profitable with lower POG, this pit is to only constrain the resource not for a scoping study Most of the continuity in mineralization is not defined yet, it needs infill drilling therefore most of the resource is in inferred category, with that resource we cannot use a low POG pit, it would only lower the resource inside the pit artificially. Also they didn't mention geotechnical parameters like pit slopes for this study because this MRE, not scoping study. In scoping study they will put more detail on the pit, at this stage it is to capture most of the resource that is mineable
- Forums
- ASX - By Stock
- Ann: Maiden Mineral Resource Estimate sets foundation at El Zorro
Peter I think was off the mark, Something has gone wrong with...
-
- There are more pages in this discussion • 117 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TSO (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.002(4.29%) |
Mkt cap ! $55.24M |
Open | High | Low | Value | Volume |
3.5¢ | 3.8¢ | 3.5¢ | $51.17K | 1.387M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 833209 | 3.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 280079 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 833209 | 0.035 |
2 | 20000 | 0.034 |
3 | 880000 | 0.033 |
6 | 1535626 | 0.032 |
2 | 532258 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.037 | 280079 | 1 |
0.038 | 1051207 | 3 |
0.039 | 1072080 | 3 |
0.040 | 1165399 | 4 |
0.041 | 211819 | 2 |
Last trade - 15.59pm 02/10/2024 (20 minute delay) ? |
Featured News
TSO (ASX) Chart |