"The Ore Reserve statement is based on modifying factors including geotechnical, hydrogeological, hydrological, ecologicaland cost estimates that describe the development of the Bulletin Pit. Material Assumptions and outcomes derived fromthe completed Pre-Feasibility Study and applied in the estimation of the Probable Ore Reserve are outlined below "
Lets hope they have got their figures right this time and the modifying factors and assumptions are too optimistic !
"The Ore Reserve statement is based on modifying factors...
Add to My Watchlist
What is My Watchlist?