"The Ore Reserve statement is based on modifying factors including geotechnical, hydrogeological, hydrological, ecologicaland cost estimates that describe the development of the Bulletin Pit. Material Assumptions and outcomes derived fromthe completed Pre-Feasibility Study and applied in the estimation of the Probable Ore Reserve are outlined below "
Lets hope they have got their figures right this time and the modifying factors and assumptions are too optimistic !
- Forums
- ASX - By Stock
- Ann: Maiden Reserve at Bulletin to drive step-change
"The Ore Reserve statement is based on modifying factors...
-
- There are more pages in this discussion • 197 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
Previous Video
Next Video
SPONSORED BY The Market Online