Nice......“With mining of Blue Bar well advanced, we see the introduction of Bulletin’s higher- grade ore to supplement the existing ore from the Klondyke open-pit as a pivotal turning point in Calidus’ ambitions to achieve a 100,000 oz per annum production rate at the Warrawoona Gold Project.”
Ann: Maiden Reserve at Bulletin to drive step-change, page-5
Add to My Watchlist
What is My Watchlist?