CAI calidus resources limited

Ann: Maiden Reserve at Bulletin to drive step-change, page-9

  1. 7,647 Posts.
    lightbulb Created with Sketch. 2115
    115 kms haulage is irrelevant given the grade... each 100t load is carrying $23,000 worth of ore.

    2.86g/t at 88% recovery = effective head grade 2.52g/t
    2 years mine life = 300kt per year ore from Bulletin to the mill = 12.5% of throughput from Bulletin (2.4Mt ÷ 300kt)
    Ignoring ore from Blue Bar the average head grade works out around 1.1g/t (7 x .9g/t + 2.52g/t) ÷ 8 = 82,500 ozs/year (2.4Mt @ 1.1g/t)

    I think we need to see a better performance from WGP if CAI hopes to produce 100k/ozs per year.
    Last edited by Dazedandconfused: 22/02/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.