Great post ILB. In the end it’s $ that matters.
NPV is the main key. The big variable is costs. CXO is way lower than most which boosts the NPV.
I would also like to see the DFS delayed which will see more tonnage, a longer mine life and a greater NPV.
- Forums
- ASX - By Stock
- Ann: Maiden Sandras Mineral Resource Grows Finniss to 6.3Mt
Great post ILB. In the end it’s $ that matters.NPV is the main...
-
- There are more pages in this discussion • 97 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
-0.005(4.17%) |
Mkt cap ! $251.8M |
Open | High | Low | Value | Volume |
12.5¢ | 12.5¢ | 11.5¢ | $378.3K | 3.149M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
80 | 4966730 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 1428936 | 23 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
81 | 5110929 | 0.115 |
120 | 7070960 | 0.110 |
76 | 4542069 | 0.105 |
152 | 10522041 | 0.100 |
10 | 375348 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 1411044 | 20 |
0.125 | 4335822 | 39 |
0.130 | 4904818 | 49 |
0.135 | 4889597 | 44 |
0.140 | 2933363 | 36 |
Last trade - 11.04am 14/10/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |