I think the numbers posted by other people are pretty reasonable. I don’t really have the time to model something that is well spoken about.
I suspect we won’t see a huge jump in tonnes in the areas previously reported because the footwall should be clearly defined into two/ three dykes. I do expect a jump in grades if the fwl zone is separated into the mineralised zones.
The new zone is looking very promising and depending on the grades might take priority over other areas.
- Forums
- ASX - By Stock
- WR1
- Ann: Main Zone extended to 2.11km by systematic drilling at Adina
Ann: Main Zone extended to 2.11km by systematic drilling at Adina, page-69
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
57.5¢ |
Change
-0.040(6.50%) |
Mkt cap ! $127.3M |
Open | High | Low | Value | Volume |
60.0¢ | 60.0¢ | 56.0¢ | $306.4K | 530.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5256 | 57.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
59.0¢ | 4914 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5256 | 0.570 |
2 | 21769 | 0.565 |
1 | 20031 | 0.560 |
2 | 30000 | 0.555 |
1 | 1000 | 0.550 |
Price($) | Vol. | No. |
---|---|---|
0.590 | 4914 | 1 |
0.600 | 13245 | 2 |
0.615 | 3197 | 1 |
0.620 | 20000 | 1 |
0.625 | 10000 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
WR1 (ASX) Chart |