CVV 2.63% 18.5¢ caravel minerals limited

Ann: Major Mineral Resource Upgrade - Caravel Copper Project, page-13

  1. 128 Posts.
    lightbulb Created with Sketch. 15
    I think a 0.1% cut-off is probably OK at the current copper price. That's equivalent to 1kg of copper per tonne. At $10 per kg, that's $10 per tonne. I'll be interested to see what processing costs per tonne are factored into the PFS, but as long as the marginal cost of production is less than $10 per tonne, CVV will be in front. CVV seems to be very conscious of the need for a business model that delivers low production costs.
 
watchlist Created with Sketch. Add CVV (ASX) to my watchlist
(20min delay)
Last
18.5¢
Change
-0.005(2.63%)
Mkt cap ! $96.99M
Open High Low Value Volume
18.5¢ 19.0¢ 18.0¢ $229.4K 1.243M

Buyers (Bids)

No. Vol. Price($)
1 7231 18.5¢
 

Sellers (Offers)

Price($) Vol. No.
19.0¢ 46399 2
View Market Depth
Last trade - 15.57pm 28/06/2024 (20 minute delay) ?
CVV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.