NRZ 23.1% 1.0¢ neurizer ltd

So that we are all on the same page, please note the passage...

  1. J L
    1,695 Posts.
    lightbulb Created with Sketch. 164

    So that we are all on the same page, please note the passage that I have highlighted.

    I think the EIS timetable has been shot to pieces. A bit sad, but that's life. J L.

    Leigh Creek – Urea Production Plant

    The proposal

    The proposal can generally be described as an industrial plant for the production of urea (a nitrogen based fertiliser for local and export agricultural markets). The proposal is located within the Leigh Creek Coal Fields (which are currently being rehabilitated) and would use synthesis gas (syngas) produced from a nearby in-situ gasification well-field as a feed stock and as fuel to generate electricity for on-site use.

    A demonstration syngas plant has been the subject of approval processes under thePetroleum and Geothermal Energy Act 2000administered by the Department for Energy and Mining.

    The plant would have an initial production capacity of up to 1 million tonnes per annum (Mtpa) of urea, with a potential to increase to 2Mtpa.

    The proposal includes the following components:

    • ammonia synthesis plant
    • urea synthesis plant
    • urea granulation warehouse, conveyor and load out facility
    • ancillary infrastructure, including permanent site offices / amenities, telecommunications and parking; construction camp (including temporary and permanent accommodation); water and power supply; effluent treatment and disposal; and surface water management
    • temporary facilities, including: laydown and pre-assembly areas; construction compound; water storage dam; and concrete batching plant.

    The proposal has been declared an ‘impact assessed’ development by the Minister for Planning. The next step is for the proponent to lodge a detailed application to determine the assessment requirements for the Environmental Impact Statement (EIS) process.

    Assessment stages and documentation

    StageDateDocumentation
    1Assessment report by MinisterPending
    2Release of assessment document by proponent for public commentPending
    3Release of assessment requirements for an EIS by the State Planning CommissionPending
    4Declaration of proposal as impact assessed development29 September 2022Government Gazette dated 29 September 2022
 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
-0.003(23.1%)
Mkt cap ! $19.02M
Open High Low Value Volume
1.1¢ 1.2¢ 0.9¢ $115.4K 10.91M

Buyers (Bids)

No. Vol. Price($)
8 1640000 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 2099891 5
View Market Depth
Last trade - 15.53pm 08/07/2024 (20 minute delay) ?
NRZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.