They did say they ordered 3 more water cannons. They should have a plan to cover a 200 mm fall of rainfall at any time of the year. Even a novice knows how water will flow from excess rainfall it should not even be a issue with a well planned mine design. It is good that it happened now. If it happened in 6 months time the Lady in charge should be replaced. Equal pay means equally competent professional work achieved. Note to our expert women designer at Federation. WATER FLOWS DOWNWARDS.
- Forums
- ASX - By Stock
- AMI
- Ann: Major Rain Event at Hera and Federation
Ann: Major Rain Event at Hera and Federation, page-5
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
18.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $304.1M |
Open | High | Low | Value | Volume |
18.0¢ | 18.5¢ | 17.5¢ | $302.8K | 1.681M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 309045 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 476120 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 309045 | 0.175 |
11 | 430248 | 0.170 |
3 | 398494 | 0.165 |
5 | 422501 | 0.160 |
4 | 455006 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 108720 | 2 |
0.185 | 570287 | 11 |
0.190 | 766834 | 9 |
0.195 | 615864 | 9 |
0.200 | 969896 | 12 |
Last trade - 16.10pm 07/06/2024 (20 minute delay) ? |
|
|||||
Last
17.8¢ |
  |
Change
0.000 ( 0.51 %) |
|||
Open | High | Low | Volume | ||
18.0¢ | 18.3¢ | 17.5¢ | 605196 | ||
Last updated 15.59pm 07/06/2024 ? |
Featured News
AMI (ASX) Chart |