Could take 6 months to find the required stamp operator... Been a holder for 3.5yrs and it's no doubt the most frustrating stock I've ever held. Through no fault of management, it's just delay after delay after delay.
- Forums
- ASX - By Stock
- BSR
- Ann: Makabingui Gold Project and Konkoutou Drilling
Ann: Makabingui Gold Project and Konkoutou Drilling, page-5
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)