The Minister for Mines has ceased, it appears, to be sleeping on the job.
The planned infill drilling is 49.5% done.
The quantum of ore in pit 1 appears as if it will increase by more than 20% over and above that previously estimated.
2 drill rigs will move the drilling pace along, especially now that the existing drill break down has rectified
Ann: Makabingui Update and Drilling Program Extension, page-4
Add to My Watchlist
What is My Watchlist?