FYI, I have run far bigger and more productive operations than this will ever be,
Seeing as MEI already have their Mining Licences and their grades certainly support PROFITABLE extraction even at todays prices, then I suspect that they will have little trouble raising Finance for their construction so they could be Production by 2026, which will be way before Makuuta is (if ever). !I am sure that Dr Tunks will hear of my suggestion, Nick certainly has.
- Forums
- ASX - By Stock
- Ann: Makuutu Demonstration Plant Equipment Install Started
I am sure that Dr Tunks will hear of my suggestion, Nick...
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IXR (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
-0.001(10.0%) |
Mkt cap ! $43.82M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 0.9¢ | $4.56K | 463.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
31 | 11098540 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 4943334 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 11098540 | 0.009 |
19 | 11400404 | 0.008 |
10 | 5389435 | 0.007 |
6 | 5835000 | 0.006 |
12 | 15368211 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 4943334 | 9 |
0.011 | 10025463 | 16 |
0.012 | 3346665 | 12 |
0.013 | 3212706 | 4 |
0.014 | 2909137 | 7 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
IXR (ASX) Chart |