Cue Energy Resources Limited A.B.N. 45 066 383 971 Level 21 114 William Street Melbourne Victoria 3000 Australia Telephone: (03) 9670 8668 Facsimile: (03) 9670 8661 Email: [email protected] Website: www.cuenrg.com.au TO : Company Announcements Office 10th Floor 20 Bond Street Sydney NSW 2000 DATE : 18 July 2008 PAGES (including this page): 2 FROM : Andrew Knox RE : Weekly Drilling Report Cobra -1A ST1: 18th July 2008 Attached please find Cue Energy Resources Limited's release with respect to the above mentioned. Yours faithfully Andrew M Knox Public Officer Cue Energy Resources Limited A.B.N. 45 066 383 971 RELEASE Weekly Drilling Report Cobra -1A ST1: 18th July 2008 Oil Search, the operator for PPL190, reports as at 0600 on 17th July 2008 that: “The Cobra -1A ST1 well was at a depth of 2,701 metres and drilling ahead. During the week wireline logging operations were completed to the well total depth of 3,202 metres. Interpretation of the wireline logs indicates that the Iagifu Sandstone interval in the well is water bearing, however a hydrocarbon column is indicated as being present in the Hedinia Sandstone objective. A short sidetrack well, of around 300 metres, is now being drilled to the base of the Hedinia Sandstone objective, so that a programme of pressure readings and sampling can take place to confirm the presence and type of hydrocarbons in this horizon. The planned total depth of the sidetrack is 2,903 metres.” Cobra -1A ST1 is located in PPL 190 and lies 13 kilometres east of the SE Gobe oil field and 7 kilometres east of the Bilip oil discovery. The participants in PPL 190 are: Oil Search Limited (Operator) 62.556% Murray Petroleum Company 26.497% Cue PNG Oil Company 10.947% Any queries regarding the announcement should be directed to the Company on (03) 9670 8668 or email [email protected]. Robert J Coppin Chief Executive Officer 18th July 2008
OSH Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held