and Red5 mill is designed that it can be upgraded to 6m tonnes pa in the future. They ordered all the crushers and everything else big to accommodate for that so cost them extra. And still under $226m. This also included the pit construction as there hood is underground and ours is just 5-10 meters from surface.
- Forums
- ASX - By Stock
- BRB
- Ann: Manna Lithium Deal to Fund Gold Focus at Lake Roe Project
Ann: Manna Lithium Deal to Fund Gold Focus at Lake Roe Project, page-123
-
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)