You would need to produce more than 100 000 oz per annum for some reasonable return.This would cost about 150 million plus from construction to gold pour.
Week 34 Wrap: HotCopper's top watched; Oz banks cut saver interest; Kamala’s 28% corporate tax; AI’s back
CC9 Chariot locks in high-potential drill target at Black Mountain, one of the USA's largest lithium landholdings
SER How flooding did Strategic Energy Resources a favour: Four holes down in 'redesigned' gold & copper campaign