I respectfully disagree from the research so far I have done. No way for 1.8m tonne processing plant. Unless someone in the know how can give some example. $120m max for 1.8m tonnes pa facility. But saying that I think they should be aiming for atleast 3m tonnes pa facility if they want their AISC to drop for the deeper ounces especially the UG ounces.