I respectfully disagree from the research so far I have done. No way for 1.8m tonne processing plant. Unless someone in the know how can give some example. $120m max for 1.8m tonnes pa facility. But saying that I think they should be aiming for atleast 3m tonnes pa facility if they want their AISC to drop for the deeper ounces especially the UG ounces.
- Forums
- ASX - By Stock
- Ann: Manna Lithium Deal to Fund Gold Focus at Lake Roe Project
I respectfully disagree from the research so far I have done. No...
-
-
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)