Here is Red5 cost for 4m tonnes pa processing mill. $188m.
And mind you that’s for a mill with 6m tonnes capable tanks and crusher. The contract was awarded in 2021. Costs have gone higher now. So let’s say for 1.8m tonnes around $120m.
keep in mind Red5 mine is UG under excesting pit. But it’s underground nevertheless so substantial cost for that included in overall $226m. Thoughts.
- Forums
- ASX - By Stock
- BRB
- Ann: Manna Lithium Deal to Fund Gold Focus at Lake Roe Project
Ann: Manna Lithium Deal to Fund Gold Focus at Lake Roe Project, page-128
-
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)