BRB 0.00% 47.5¢ breaker resources nl

This one sounds cheap to me. I would estimate total cost of...

  1. 4,758 Posts.
    lightbulb Created with Sketch. 1116
    This one sounds cheap to me. I would estimate total cost of around $200m for 2mtpa.

    Bardoc Gold Project Kalgoorlie 2021

    Pre-production CAPEX for the proposed development has been estimated at $177.4 million, with the new 2.1-million-tonne-per-annum conventional CIL processing plant and flotation circuit speaking for $104.3 million of that total.
 
watchlist Created with Sketch. Add BRB (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.