IMHO too early to think at capex here, there are optionality for example RMS is drilling 75kRC at Lake Rebecca in the 40km radius, there are two operating mills nearby 50km radius. For example can we sell the ore from open pit and build later for UG high grade with those revenues? JV with RMS ? Etc