GL1 global lithium resources limited

Ann: Manna Metallurgical Test Work Update, page-2

  1. 21 Posts.
    Key Highlights
    • Ongoing optimisation testwork on the Manna Lithium Project Whole-of-Ore (WOO) flotationflowsheet achieving excellent improvements in lithia recovery

    • Optimisation testwork focussing on magnetic separation and mica pre-flotation stages hasincreased Li2O recoveries from 70% to 75% for spodumene composite ore samples.

    • Further optimisation testwork is pursuing improvements in recovery via reduced slimes losses,reprocessing of magnetic separation tails, and engaging with reagent suppliers to optimisespodumene flotation circuit operating conditions

    • Testwork results continuing to achieve >5.5% Li2O spodumene concentrate (SC), with ongoingoptimisation targeting grade increases• A total of 66 flotation tests have been completed to-date producing a SC product of5.6 - 6.5% Li2O and 0.4 - 0.8% Fe2O3

    • Preparations for the next phase of ore sorting testwork are well advanced with trials imminent atSteinert’s industrial testwork facility in Perth

    • This increase in lithia recovery will have a positive impact on project economics at Manna
    Last edited by ThatFroggy: 07/03/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
23.0¢
Change
0.020(9.52%)
Mkt cap ! $58.88M
Open High Low Value Volume
22.0¢ 23.0¢ 22.0¢ $93.57K 414.6K

Buyers (Bids)

No. Vol. Price($)
1 13048 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 79716 1
View Market Depth
Last trade - 16.10pm 22/07/2025 (20 minute delay) ?
GL1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.