As I wrote previously, an incentive structure based on achievement of short-term price targets rather than specific operational outcomes provides an incentive for share price manipulation.
I find it disappointing that AVZ continue to incentivize management and contractors on short-term share price outcomes rather than well-defined operational metrics that would see the project move towards production.
If the latter was the case, the share price would then take care of itself.
DYOT
- Forums
- ASX - By Stock
- Ann: Manono Lithium Project drilling program
As I wrote previously, an incentive structure based on...
-
-
- There are more pages in this discussion • 113 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)