Fair call BP if they are going to go to all the trouble of drilling the resource. Tardy data entry is really poor form. There is huge difference is the logging of the same hole in two different reports? And the result is worlds apart.
thanks for your posts.
- Forums
- ASX - By Stock
- Ann: Manono Lithium Project drilling program
Fair call BP if they are going to go to all the trouble of...
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
78.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.752B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AVZ (ASX) Chart |
Day chart unavailable